Home Climate change Projects under Joint Implementation Displacement of electricity generation with fossil fuels in the national electricity grid by implementation of the third Combined Cycle Gas Turbine power generation system with the installed capacity of 151.5 MW
Displacement of electricity generation with fossil fuels in the national electricity grid by implementation of the third Combined Cycle Gas Turbine power generation system with the installed capacity of 151.5 MW Print E-mail
Employer:
PJSC “Ecoenergiya”
Services Provided:
JI project development and maintenance under Kyoto protocol on Climate change
Project title:
«Displacement of electricity generation with fossil fuels in the national electricity grid by implementation of the third Combined Cycle Gas Turbine power generation system with the installed capacity of 151.5 MW»
CAPEX:
? $ 200 million 
Project Location:
Ukraine, Lugansk oblast, Alchevsk city
Beginning of project implementation:
2014
Estimated project lifetime:
25 years
Supplier:
Mitsubishi Heavy Industries Ltd.
Registration number:
 

Project summary

The project envisages the construction of the combined cycle gas turbine power generation facility at public company “AISW”, using coke oven, blast furnace and converter gases as a fuel. The project aims to utilize exhaust steel gases for displacement of electricity from the national electricity grid, produced on the fossil fuel.


Technical aspects of the project

Project activity includes the installation of:

  • combined cycle gas turbine power generation system with the installed capacity of 151,1 MW.

The project implementation improves the company profitableness, including carbon credits selling, and thus provides cash incomes for credit and investment funds reversion. 

Execution of JI project


Project Idea Note (PIN) Letter of Endorsement Project Design Document (PDD) Determination report Letter of Approval (Ukrainian) Letter of Approval (foreign) Project registration
29.03.2008 06.05.2008 15.01.2009

Emission reductions of СО2

The general СО2 emission reductions are connected with electricity production at public company “AISW” and suspension of the electricity purchasing from the national electricity grid, produced on the fossil fuel basis.


ERU, t of СО2
2014
2015
2016
1 040 824
1 040 824
1 040 824
 