Home Climate change Projects under Joint Implementation Installation of a new Waste Heat Recovery System in Alchevsk Coke Plant, Ukraine
Installation of a new Waste Heat Recovery System in Alchevsk Coke Plant, Ukraine Print E-mail

5_1

Employer:

PJSC “Alchevskkoks”

Services Provided:
JI project development and maintenance under Kyoto protocol on Climate change
Project title:
Installation of a new Waste Heat Recovery System in Alchevsk Coke Plant, Ukraine
CAPEX:
$ 40 million
Project Location:
Ukraine, Luhansk oblast, Alchevsk city
Beginning of project implementation:
September 30, 2007 year
Estimated project lifetime:
20 years
Supplier:
Giprokoks, VAI-Siemens, «Energomash LTU», Siemens VAI
Registration number:
UA1000130

Project summary: 

The project envisages the high-quality blast furnace coke production by the dry quenching method and utilization of waste steel gases for electricity generation.

The dry coke production will be executed due to the implementation of Coke Dry Quenching facility – the system of steam production with the help of burning coke in the special inert environment. As a result of CDQ waste heat will be utilized as steam of high temperature parameters and pressure, it’ll give the possibility to produce own pollution-free energy.

 

Technical aspects of the project

Project activity includes the installation of:

  • CDQ up to 70 tons of dry coke per hour;
  • steam boiler, which uses coke oven and blast furnace gases as a fuel up to 75 tons of steam per hour capacity;
  • electricity generator with the capacity of   9,13 Mw.

The project became the first one of a kind in Ukraine. As a result, the successful project implementation will have a considerable demonstrative influence in our country in general. Besides the integral estimate methodology of CDQ influences on the GHG emission reductions, which includes the calculations of the coke quality effect on СО2 emissions. The project also have a considerable positive environmental and social effects for Alchevsk city and its region in general.

 

 

Project Idea Note (PIN)
Letter of Endorsement
Project Design
Document (PDD)
Determination report
Letter of Approval (Ukrainian)
Letter of Approval (foreign)
Project registration
31.07.2006
09.11.2006
24.12.2009
22.12.2009
29.12.2009
07.09.2009
29.01.2010

Emission reductions of СО2

Due to the project implementation the GHG emission reductions are achieved in the way of coke quality increase and reduction of coke consumption at blast-furnace production, utilization of coke and blast-furnace gases aimed for own steam production and energy suppression from Ukrainian electricity grid in the way of own electricity production at the plant.

 

ERU, t of СО2
2007
2008
2009
2010
2011
2012
33 459
134 542
190 644
163 792
198 775
253 735

 

 

 