Home Climate change Projects under Joint Implementation Technical Upgrade of OJSC “Dniprovsky Integrated Iron and Steel Works named after Dzerzhynsky” by Installation of Two Billet Continuous Casting Machines and Two Ladle Furnaces
Technical Upgrade of OJSC “Dniprovsky Integrated Iron and Steel Works named after Dzerzhynsky” by Installation of Two Billet Continuous Casting Machines and Two Ladle Furnaces Print E-mail
Реконструкція ВАТ «Дніпровський металургійний комбінат  ім. Ф.Е. Дзержинського» на основі спорудження двох сортових МНЛЗ та двох установок піч-ковш
Employer:
PJSC “Dneprovsky Integrated Iron and Steel Works
named after Dzershinsky"
Services Provided:
JI project development and maintenance under Kyoto protocol on Climate change 
Project title:
Technical Upgrade of OJSC «Dniprovsky Integrated Iron and Steel Works named after Dzerzhynsky» by Installation of Two Billet Continuous Casting Machines and two Ladle Furnaces
CAPEX:
$ 187,1 million
Project Location:
Ukraine, Dniprovsky region,
Dniprodzerzhinsk city
Beginning of project implementation:
4 quarter of 2008 year
Estimated project lifetime:
40 years
Supplier:
Registration number:
UA1000280

Project summary

The project activity aims to improve the production capacity competitiveness of PJSC “Dneprovsky Integrated Iron and Steel Works named after Dzershinsky” (DIISW) due to modernization of its main manufacturing equipment for steel smelting and rolling in the way of Ladle Furnaces implementation, where liquid steel will be treated out-of-furnace and Continuous Casting Machines (CCMs). It’ll give the possibility to provide the increased volume of liquid steel output and at the same time to reduce input of fuel and energy resources per unit of steel output.

Technical aspects of the project

Project activity includes the installation:

  • two Ladle Furnaces (LDs – 1,2);
  • two Continuous Casting Machines (CCMs - 1,2).
   bazad_dmkd_mnlz_eng
strelo4ka proekt_mkd_mnlz_eng
The project implementation improves the profitableness of PJSC “DIISW” due to carbon credits trading, in such a way providing revenues incomes for the sake of investments costs reversion. The project implementation has the considerable influence on the regional environmental situation and also assists to appearance of the new work places. The project is one of the largest ones at steel production scope in Ukraine for the last decades.

Execution of JI project


Project Idea Note (PIN)
Letter of Endorsement
Project Design Document (PDD)
Determination report
Letter of Approval (Ukrainian)
Letter of Approval (foreign)
Project registration
11.2009
01.2010
08.2010
04.2011
08.2011
07.2011
08.2011

Emission reductions of СО2

As a result of project implementation the GHG emission reduction is achieved at such steel processes as domain and sinter ones due to the reduction of manufacture expenses, especially during steel teeming.


ERU, t of СО2
2008
2009
2010
2011
2012
139 587
802 339
828 279
1 140 132
1 348 001
 