Home Climate change Projects under Joint Implementation Displacement of electricity generation with fossil fuels in the national electricity grid by an electricity generation project with introduction of CCGT electricity generation facility at the OJSC "DIISW" with installed capacity of 303 MW
Displacement of electricity generation with fossil fuels in the national electricity grid by an electricity generation project with introduction of CCGT electricity generation facility at the OJSC "DIISW" with installed capacity of 303 MW Print E-mail
Employer:
“Regenza”, Ltd.
Services Provided:
JI project development and maintenance under Kyoto protocol on Climate change 
Project title:
«Displacement of electricity generation with fossil fuels in the national electricity grid by an electricity generation project with introduction of CCGT electricity generation facility at the OJSC "DIISW" with installed capacity of 303 MW»
CAPEX: 
$ 400 million
Project Location: 
Ukraine, Dnepropetrovska oblast, Dneprodzerzhinsk city
Beginning of project implementation:
2014 year
Estimated project lifetime:
27 years
Supplier:
Registration number:

Project summary

The project envisages the construction of the CCGT at the project site of PJSC “DIISW”, aiming to utilize waste steel gases, especially blast furnace and converter gases for the electricity displacement that is produced on the fossil fuels basis from the national electrical network.


Technical aspects of the project

Project activity includes the installation of:

  • two CCGT with a capacity of 303 mW and subsidiary facilities.

This project is only the second analogous one in Ukraine, that’s why it’ll have the great demonstrative effect. Project implementation will improve company’s profitableness, due to carbon credits selling, thus will provide cash incomes for sake of credit reversion and invested money. Besides the project will improve the general raw-materials effectiveness and improve the position of the “IUD” corporation at the market.

Execution of JI project


Project Idea Note (PIN)
Letter of Endorsement
Project Design Document (PDD)
Determination report
Letter of Approval (Ukrainian.)
Letter of Approval (foreign.)
Project registration
20.10.2008
03.03.2010
 
 
 
 
 

Emission reductions of СО2

The facility will use all steel gases surplus, which appeared after modernization and broadening of steel enterprise. Thus, there will be no emissions into the atmosphere, that will reduce the negative impact into the environment. Gas utilization will give the possibility to produce electricity, which will displace the equivalent amount of electricity from the national electricity grid, that will lead to the reduction of fossil fuels consumption and in such a way will reduce the GHGs emissions into the atmosphere.


ERU, ths. t of СО2
2014
2015
2016  …
2 200
2 200
2 200
 