Home Climate change Projects under Joint Implementation Displacement of electricity generation with fossil fuels in the electricity grid by an electricity generation project with introduction of Top Pressure Recovery Turbines at Alchevsk Iron and Steel Works
Displacement of electricity generation with fossil fuels in the electricity grid by an electricity generation project with introduction of Top Pressure Recovery Turbines at Alchevsk Iron and Steel Works Print E-mail
Employer:
PJSC “Alchevsk Iron and Steel Works”
Services Provided:
JI project development and maintenance under Kyoto protocol on Climate change  
Project title:
«Displacement of electricity generation with fossil fuels in the electricity grid by an electricity generation project with introduction of Top Pressure Recovery Turbines at  Alchevsk Iron and Steel Works»
CAPEX:
$ 31,5 million
Project Location:
Ukraine, Luhanskaia oblast, Alchevsk city
Beginning of project implementation:
2013 year
Estimated project lifetime:
20 years
Supplier:

Mitsubishi Heavy Industries Ltd.

Registration number:

 

Project summary

The project envisages the displacement of electricity production on the basis of fossil fuels in the electricity grid by an electricity generation project with introduction of Top Pressure Recovery Turbine (TRT) at PJSC “Alchevsk Iron and Steel Works”. TRT will use the excessive pressure of Blast Furnace Gas (BFG), which is generated as a result of pig iron production. Due to the power production at TRT, AISW will reduce its electricity consumption from the grid and therefore will reduce СО2.


Technical aspects of the project

Project activity includes the installation of:

  • TRT (capacity = 15,4 MW), equipped with air heater, electrical precipitator and dust separator.
The project will be the first of kind in Ukraine and will have a demonstrative effect. The proposed project is undoubtedly the best modern alternative at the market, because for today none of the steel plants in Ukraine has implemented the similar projects because of complexity of gas cleaning problem, comparatively significant financing and also not high electricity tariffs. The project implementation will reduce company's expenses on electricity purchase by way of its own production, and also attracts the additional assets from carbon credits selling.

Execution of JI project


Project Idea Note (PIN) Letter of Endorsement Project Design Document (PDD) Determination report Letter of Approval (Ukrainian) Letter of Approval (foreign) Project registration
25.11.2008 23.01.2009          

Emission reductions of СО2

The GHGs emission reductions are achieved due to the technological waste gases utilization and the reduction of fossil fuels (natural gas and coal) consumption.


ERU, ths. t of СО2 2013 – 2020
875,76
 