Home Climate change Projects under Joint Implementation Revamping of sintering and blast-furnace production at JSC «Zaporizhstal», Ukraine
Revamping of sintering and blast-furnace production at JSC «Zaporizhstal», Ukraine Print E-mail
Employer: PJSC «Zaporizhstal»
Services provided: JI project development and maintenance under Kyoto protocol on Climate change 
Project title: «Reconstruction of the agglomerate and blast-furnace production at the JSC «Zaporizhstal»
CAPEX: $ 236 million
Project location: Ukraine, Zaporizhia city
Beginning of project implementation: January 1, 2003
Estimated project lifetime: 40 years
Equipment supplier:  Kuttner, URALMACH
Registration number: UA1000266

Project summary


Project activity envisages greenhouse gases emission reductions into the atmosphere through the implementation of special measures that are directed to the reduction of energy resources expenses on production of the product unit. Besides this, the project will assist in improvement of environment situation at the enterprise.
PJSC “Zaporizhstal” is the enterprise with the full metallurgical cycle, which produces hot rolled coils and cold rolled coils and also tinplate. Zaporizhstal is the producer of agglomerate, pig iron, steel and rolled metal. PJSC «Zaporizhstal» ensures contractual supplies of high quality goods, nearly 70% of which is exported.

Technical aspects of the project

Project activity includes:

  1. improvement of pig iron production process;
  2. improvement of sintering process;
  3. improvement of secondary energy resources production process.
Zaporozh_baza_Eng
Zaporozh_project_Eng

Using of JI mechanism in accordance with Kyoto Protocol to the United Nations Framework Convention on Climate Change allowed from 2003 to begin the realization of complex of measures on blast furnaces, sintering machines and auxiliary equipment of sintering production modernization with the aim to achieve the reduction of energy resources expenses and materials per unit of product and, in such way, to reduce anthropogenic emissions of carbonic acid gas.

Execution of the JI project


Project Idea Note (PIN)
Letter of Endorsement
Project Design Document (PDD)
Determination report
Letter of Approval (Ukrainian)
Letter of Approval (foreign)
Project registration
12.2007
12.2007
04.2011
05.2011
05.2011
04.2011
06.2011

Emission reductions of СО2


The project implementation leads to GHGs emission reductions due to:

  1. reduction of specific volumes of consumption of coke, natural gas and other energy resources;
  2. reduction of specific volumes of consumption of raw materials etc.
Emission reductions, t of СО2
2004-2007
2008 2009 2010 2011 2012
1 919 311
469 057
279 504
297 410
383 662 383 662
 